6655 Avienda Desierto Verde , Lake Havasu City AZ

$1,500,000 | $6,947 / Month*

List Firm - Brooks-Clark And Assoc
MLS #1015810

Location

Features

Details
Square Feet: 2494
Bedrooms: 4
Baths: 3
Half Baths: 1
Appliances/Equipment: Built in Microwave, Dishwasher, Disposal, Electric Cook Top, Electric Oven, Garage Door Opener(s)
Lot Description: Level to Street, Rd Maintained-Public, View-Mountains
Pool: Private
Zoning: L-R-1 Single-Family Residential
Association Fee: 100
Foreclosure: No
Approximate Garage Depth: 61-70
Garage Features: Attached, Bathroom In Garage, Door - 14+ Ft Height, Door - 9 Ft Height, Drive Through, Motor Hm/RV Garage
Features
Interior Features: Breakfast Bar, Casual Dining, Ceiling Fan(s), Counters-Granite/Stone, Data Wiring/Cat 5, Kitchen Island, Open Floorplan, Pantry, Security Wired, Surround Sound Wired, Walk-In Closet(s)
Flooring: Carpet, Tile
Exterior Features: Landscape-Front Yard, Motor Home/RV Hookups, Watering System
Construction: Stucco, Wood Frame
Roof: Tile
Style: Mediterranean
Fencing: None
Utilities
Cooling: Central Air, Electric, Ground Mount Unit(s)
Heating: Central, Electric, Ground Mount Unit(s)
Laundry Hookup: Electric, House
Sewer Type: Public Sewer

Welcome to 6655 Avienda Desierto Verde, situated in the beautiful arroyos at Havasu Foothill Estates, this property is here to offer you the entire package. From a double wide, climate controlled RV garage to a beautiful pool in the backyard with amazing mountain views, this home is completed with some incredibly high end finishes. As you approach this property you will notice pavered driveways, iron front door as you make your way into the home you will find 12 ft ceiling in the entry and 10 ft ceilings throughout the rest of the home that showcase open kitchen and living areas, plenty of room for entertaining! some of Emerald Bay Construction signature finishes are synthetic stucco, R21 in the walls and R50 in ceilings for an energy efficient home. Don't miss out on this new construction home! Agent is related to builder. Estimated time of completion is end of March 2022

My Notes

Thoughts about this property? Write them down for quick reference the next time you view this property.